Tender Dossier for the Construction of the Manzini Trade Hub

Advert for MTH.
Contract Notice
Design Drawing
VOLUME 1-SECTION 1-2

VOLUME 1- SECTION 4

1.4.-Technical Offer Questionaire Contents   
1.4.1-Technical Offer General Information
1.4.2-Tech Offer Organisation Chart
1.4.3-Tech Offer Power of Attorney
1.4.4-Tech Offer Financial-Statement
1.4.5-a-Financial Identification Both Individual and Company
1.4.5-b--Legal Entity company

1.4.5.b--Legal Entity File Individual
1.4.6-Tech  Offer Technical Qualifications

VOLUME 1- SECTION 5

1.5.1-Evaluation Admin Compliance grid 
1.5.2-Evaluation grid 

VOLUME 2

2.1 Contract agreement

2.2--Special Conditions

2.3-Prefinance guarantee
2.4-Performance guarantee
2.5-Retention guarantee

2.6-Tax--customs-arrangements

 

VOLUME 3

3.1.--Technical Specifications.
3.2.-Technical Specifications

VOLUME 4

4.3-Financial Offer

4.3.2-Bill Of Quantities

VOLUME 5

5.5.1.1 GFP.ELV.SCT-01 BATHROOM DETAILS

5.5.1.11-03 BATH LAYOUT

5.5.1.12-05 ROOF-LAYOUT AND DETAILS

5.5.1.3-SCT-SLEEPERS-SECTION-B-B
5.5.1.13-MTH-11-17--E1 Bath-area Layout1
5.5.1.14-MTH-11-17-E2 Sleepers Layout1
5.5.1.15-MTH-11-17-E3 Market-Layout1
5.5.1.16-MTH-11-17-E4 Site plan Layout2
5.5.1.2-GFP SLEEPERS DETAILS
5.5.1.4- STP-01 SITE PLAN
5.5.1.5-001 PLATFORM LAYOUT
5.5.1.6-01 TRADE AREA FOUNDATION LAYOUT AND DETAILS
5.5.1.7-01 TRADE AREA LAYOUT

5.5.1.10-03 BATH-FOUNDATION SURFACE BED LAYOUT AND DETAIL

5.5.1.8-02 SLEEPERS FOUNDATION SURFACE BED LAYOUT-AND-DETAIL 
5.5.1.9-02 SLEEPERS-LAYOUT

 

 

 

OffCanvas Menu